Thursday, August 29, 2013

More framing

Framing continues.  The south wall of the first floor and some of the interior walls were assembled today.  Scroll down to check out the video of the south wall being lifted into place.



The adhesive bead that seals the base plate of the wall to the subfloor.
I have some concerns about the lack of a seal between the sheathing
and the subfloor which I might write up in a subsequent post.








Raising the south wall.


The unsheathed section in the upper right of the wall makes me think a window
in that spot would be awfully nice.  Change order incoming....




1st floor bedroom on the left and bathroom on the right.


No comments:

Post a Comment