Friday, August 30, 2013

Prepping for the ridge beam




Working on the second floor.  Only the bedroom and bathroom side
will have a second floor.  The main space will be an vaulted ceiling.




The rough openings on the lake side.




Three 24" deep 26' long LVLs that will make up the ridge beam.
Each LVL weighs 350 lbs.


No comments:

Post a Comment